Development

Sr. No Category Work Details Probable date of completion Area/Beneficiaries
1 PIPE LINES TO CONSTRUCTION THE 355 M.M A.C PIPE LINE IN THE 24 WARD NAVODAYANAGAR FROM ''SLSR'' TO NRT PRIDE APARTMENT 08/07/2016 CONTRATER,SRINIVASA ENGINEERING,NARASARAOPET
2 PIPE LINES TO CONSTRUCTION THE 355 M.M A.C PIPE LINE FROM T.B TANK AT SWAMI SCHOOL OF PATEL REDDY HOUSE 08/07/2016 CONTRATER,SRINIVASA ENGINEERING,NARASARAOPET
3 CLEAR LEAKS TO CLEAR THE GRAVITY WATER PIPE LEAKS IN THE NARASARAOPET MUNICIPALITY. 19/07/2016 CONTRATER,D.BHASKAR,NARASARAOPET
4 WATER SUPPLY TO SUPPLY OIL ENGINES AND TO FILL THE WATER IN NAKARIKAL WATER TANK 08/07/2016 CONTRATER,D.BHASKAR,NARASARAOPET
5 WATER SUPPLY TO FILL THE WATER IN S.S.TANK THROUGH RIGHT CANAL OF NAGARJUNA SAGAR. 25/06/2016 CONTRATER,D.BHASKAR,NARASARAOPET
6 WATER SUPPLY TO CLEAR THE WATER PIPE LEAKS IN NARASARAOPET FROM 18 WARD TO 34 WARD. 04/05/2016 CONTRATER,D.BHASKAR,NARASARAOPET
7 WATER SUPPLY TO CLEAR THE WATER PIPE LEAKS FROM SANTHINAGAR FILTERATION PLANT TO NARASARAOPET MAIN LINE. 04/05/2016 CONTRATER,D.BHASKAR,NARASARAOPET
8 WATER SUPPLY TO WATER SUPPLY METIRIALS ARE ARRANGED TO THE GANDHI PARK IN NARASARAOPET. 19/04/2016 CONTRATER,SK.MOHIDDIN BASHA,NARASARAOPET
9 WATER SUPPLY TO CLOSE LOCKS IN NARASARAOPET THE KOTAPPAKONDA ROAD AREA AND SUSMITHA HOSPITAL AREA. 19/04/2016 CONTRATER,SK.MOHIDDIN BASHA,NARASARAOPET
10 WATER SUPPLY TO SUPPLY THE BORE WELL METIRIALS IN NARASARAOPET 07/04/2016 CONTRATER,D.BHASKAR,NARASARAOPET
11 CC DRIAN LAYING THE CC DRIAN IN THE 21 WARD FROM D.NO.11-18-68/1 TO D.NO.11-18-1 18/07/2016 CONTRATER ,M.RAVI KUMAR,NARASARAOPET
12 ROAD TO RECONSTRUCTIONS THE ROAD HOLES FROM 18 WARD TO 25 WARD. 18/07/2016 CONTRATER,N.HARINARAYANA,NARASARAOPET
13 ROAD TO RECONSTRUCTION THE ROAD HOLES FROM 1 WARD TO 8 WARD. 18/07/2016 CONTRATER,N.HARINARAYANA,NARASARAOPET
14 ROAD TO RECONSTRUCTION THE ROAD HOLES FROM 9 WARD TO 17 WARD. 18/07/2016 CONTRATER,N.HARINARAYANA,NARASARAOPET
15 WALL LAYING THE WALL HEIGHT TO ENTRANCE GATE IN THE RAVIPADU ROAD OF HINDU SMASANAM VATIKA 29/06/2016 CONTRATER,K.SANJEEVARAO,NARASARAOPET
16 CC ROAD LAYING THE CC ROAD IN THE 32 WARD OF 2 ND ROAD FROM POLE NO.401/13/1/2 TO D.NO.1-2-9/G. 24/06/2016 CONTRATER,K.KOTESWARAO,NARASARAOPET
17 CULVERT TO ARRANGEMENT THE CULVERTS IN THE 32 WARD FROM D.NO.2-10-1 TO 2-10-16. 24/06/2016 CONTRATER,SK.M.BHASHA.NARASARAOPET
18 LOCKERS TO ARRANGEMENT THE LOCKERS OF ''PUNNYABHUMI SMASANA VATIKA'' BESIDE OF SSN COLLEGE IN NARASARAOPET. 21/06/2016 CONTRATER ,NEW MADHU LIGHTING,NARASARAOPET
19 ELCTRICAL WORK TO SET THE ELECTRICAL EQUIPMENT OF STREET LIGHT IN THE VARIOUS LOCATIONS OF NARASARAOPET. 17/06/2016 CONTRATER,D.BHASKAR,NARASARAOPET
20 FYLON TO SET THE FYLON IN THE GUNTUR ROAD OF NARASARAOPET. 15/06/2016 CONTRATER,V.VENKATARAO,NARASARAOPET
21 GRAVEL LEVELING TO FILLING THE GRAVEL IN THE MUSILEEM KHABARSTAN OF 5 BLOCKS ,NARASARAOPET 15/06/2016 CONTRATER ,SK.MD.REYAJ BHASHA
22 FLOWER POTS,PLANTS TO ERANGED THE FLOWER POTS AND PLANTS IN THE VARIOUS LOCATION OF NARASARAOPET MUNICIPALITY. 20/04/2016 CONTRATER,M/S RAVI TEJA,NARASARAOPET.
23 TOILETS TO DEVELOPMENT THE TOILETS IN THE MUSILEEM KABHARSTAN. 20/04/2016 CONTRATER ,SK.MD.REYAJ BHASHA
24 CHALIVENDRAM TO ERANGEMENT '''''CHALIVENDRAM'' THE VARIOUS LOCATIONS IN NARASARAOPET. 30/05/2016 CONTRATER,D.BHASKAR,NARASARAOPET
25 ELCTRICAL WORK TO ERANGEMENT THE A/C FITTING ,3 PHASE WIREING AND PALEN BOARD IN THE COUNCEL WAITING HALL. 30/05/2016 CONTRATER,N.HARINARAYANA,NARASARAOPET

Pages